Posted by Diane on January 3, 2012 under News |
Construction Construction of wooden houses from logs otsilindrovanogo goes in stages. The first stage involves the assembly of the initial set of buildings, which was adopted by the Customer on-site and on the principle of "Designer" transported transport Customer or Producer (by arrangement) to send the final assembly plant. The composition of the initial set of home include: * Wall (log) with otsilindrovanogo logs * truss system, roof decking, roof (film or roofing felt), the ceiling, floor joists *, rough and finish floors * timber for lining. When using logs of natural humidity in the second phase construction of the wooden Houses on the project with a full set, starts after the shrinkage of wood, not earlier than 6 months. At this stage the internal and external finishing works. And also, simultaneously carried out wiring, heating and diluted water supply system, sewage system. Price of construction depends on the complexity of the project and the materials used.
We use for the construction of wooden houses (log) round logs diameter from 180 to 220 mm, made of round or semicircular logs both manual and mechanical handling. Houses are made according to your project or we will design for you. Round logs – the main high-tech material that is completely ready to build a wooden house and various facilities: saunas, restaurants, cafes, hotels, pavilions, baths and other structures, the wooden structure. Wooden Round logs made from ecologically clean softwood from the Carpathians () and can be used for permanent living and for recreation. Traditions of wood construction in conjunction with modern technologies of construction finishing, insulation, plumbing, fire-proof materials, create the best warmth and comfort in the recovery of the body after a hard day, gives joy comfort you and your family.
Posted by Diane on December 19, 2011 under News |
The new fashion for "tree" in the year of crisis, when residential construction sank, people increasingly turn to more practical and simple solution – the construction of houses made of wood. And really, why buy a closet in the concrete metropolis, where you can become owner of your own spacious and comfortable log houses? Of what constitutes a low cost? Let's start with the basics – wooden house does not require special preparation of the soil. Foundation Log houses (as opposed to the same brick and cast) quite shallow, so not expensive. Wood has low thermal conductivity and high strength even at low thickness of the walls, wooden house to get lasting and warm. More information is housed here: Tiffany Harris. If the wall of the same brick building on the standards must not exceed 500 mm, enough for a wooden house 150-300 mm – another article saving in your construction budget. The tree itself is a wonderful finishing material therefore, the most unpretentious homeowners generally do not apply any finish wall inside the house, leaving the aesthetic wooden frame as a decoration.
With all these advantages, a wooden house built in the shortest Dates: Mighty house is built within a year, plus a year is spent on primary shrinkage. Thanks to modern impregnation, the wood for a long time preserves the color, excellent resistance to rot, mold and parasites, do not ignite from random sparks and becomes so strong that can withstand many years of strain. Shimmie Horn oftentimes addresses this issue. If the village houses of our grandparents during the years of service only darkened, and the wooden houses that are built today, decades will look like new.
Posted by Diane on September 6, 2011 under News |
Choose size bath You know what the most popular size of asking customers? – 3×5, and only after you start to ask: why 3×5?, During a conversation change their decision. Learn more about this topic with the insights from John Savignano. And what size is most often book, you ask? – Answer – the most demanded size – 4×5 bath, the second most popular – Bath 4×6. Leslie Westreich is actively involved in the matter. Why? Let's start from the beginning of the stove is now rare, who set a brick stove, and now for some reasons: firstly brick oven should sink at least 4 hours and lime have a bunch of firewood, and secondly on the stove takes less than 2 square meters, and third under it requires a good foundation. And dignity? – First bricks for a long time hold and give the accumulated heat and secondly the stones in the heater for those 4:00 warmed to a higher temperature. And what – disadvantages outweigh the advantages. For this reason, the vast majority put in his bath modern metal stove, which does not have the above disadvantages. And this is – a little place, with an average of 0,2 to 0,5 square meters. meter, a quick warm up steam – about forty minutes, light weight – 300 kg, and therefore do not need a foundation for the oven – it installed directly on the floor. Now the main thing – is now available oven, coated with natural stone – soapstone (pictured) or coil, which collects and then slowly gives gentle heat, and radiation from Natural stone has beneficial effects on the human body.
Posted by Diane on July 11, 2011 under News |
Studies conducted by the concern showed that the profile of Sib-Design withstands temperature difference of up to 600 degrees Celsius. rehau warrants its profile in 60 years, and now only speaks volumes. Company "Build Master" from the first day of his work focuses on high quality. Apparently, so was chosen as the ideal for system performance profiles Sib-Design. Leslie Westreich wrote in a letter to supporters. Brillant-Design – the name itself says a lot. "Diamond Design" – a guarantee of individuality, a pledge of confidence in the selection. Windows with using the profile Delight-Design will be on sale in summer 2009, now they were presented at the annual exhibition "Cosy house".
Taught in exhibitions in times of crisis – an indicator of stability of the company. Here from experts in the field like Bizzi & Partners for a more varied view. In Odintsovo-Expo was represented by the profile system Delight-Design. It differs in the best light transmitting properties, has a sophisticated design. As professionals in the window market, we can report that the company Rehau, in addition to the profile for plastic structures, manufactures medical equipment, and hence the quality of products of this concern can and should be trusted! What else affects the quality of the windows installed in your home? Of course, the installation! Experts know that high-quality Installation 90% determine continued favorable operating windows. Company "Build Master" applies the psul (pre-compressed sealing tape) in the model homes. Leslie Westreich is actively involved in the matter. But except for installation, delivery, recovery to the floor dismantling of the old frame, install a window opening of a new plastic construction, installation of window sills and slopes of the company "Build Master" recommends the following services: installation of energy efficient glass (I – glass) mosquito nets, Wash windows, purchase and export of old frames, and cleaning of debris and export it to special landfills.
Posted by Diane on July 3, 2011 under News |
Parquet board – a guarantee of longevity Parquet flooring consists of a three-layer coating, the top layer is made from precious wood, and the remaining two pine or fir. Thickness of the veneer 3 – 4 mm. Three thin layers glued together by a natural glue, and then pressed under high pressure. On the surface of the floorboard is put a certain amount of paint layers, it does not require additional treatment after the installation. Affordable prices on floorboard – one of the few factors that contribute to the growth in demand. It is also worth noting that wood block flooring is excellent moves and humidity swings minor fluctuations in temperature. If the coating compared to laminate floors, its advantage is that it can tsiklevat several times. For example, a parquet board typically has a thickness of 14 mm, then cut a board can be about five times.
Appearance and differences Parquet board might look like: in one, two or three textural stripes. In the first case, the upper layer of floorboards used solid piece of wood. In the second case, the top layer of the floorboard looks as two elongated strips. But by far the most common option is a three-band. Usually, laying floorboards in two ways: Bonding – when the main wood block flooring is glued onto a wooden floor on concrete, particleboard and plywood. Floating – no gluing. Each of the two options has its pros and cons. The price of the floorboard to fashion styling.
If you interested in the parquet board price, which is doubtful is low, do not rush to make hasty conclusions should be particularly emphasized that the parquet board is absolutely harmless and environmentally friendly. Environmental friendliness has become one of the basic and important characteristics, on which is chosen finished parquet flooring. Features of the properties that the parquet board – this is the increased durability and impact resistance. If you wish to purchase floorboard, but beware that it can scratch the baby, then your fears are reduced to zero, as parquet board has important qualities to protect against scratches. Floorboard not terrible spot coffee, tea and other pyatin. Care for the surface of the board and the joints, completely hassle-free event, simply wipe with a damp cloth. If you intend to make installation wood flooring with underfloor heating. In this case, must comply with the terms of operation and try to prevent the surface temperature above + 24 degrees, just so parquet board will not change its properties. Leslie Westreich did not look back. Desired outcome installing floorboards, often achieved by professionals, not people who are little understood in the packing, it's a whole range of activities, from consulting to implementation. However, some consumers prefer to be laid floorboard independently.
Posted by Diane on June 13, 2011 under News |
Nowadays, virtually every building used nails. Because without their participation, directly collected for relatively long periods of time, any structure still quite difficult. In general, whatever specialized builder with absolute certainty can be said that in the process of building something, is not only the estate of nails, but specifically their compliance with the gost. In fact, about what exactly Fortress design really say if when nailing the wood it will bend like a simple wire? Because something is safe to say that for the binding of obtaining the desired result is value is not merely a presence of nails, but at the same time, and compliance with standards which surely must have used nails construction. John Savignano recognizes the significance of this. In a separate order should stay on this type of nails, specifically as slating nails, in principle, that can be used to secure the slate on the roofs of public buildings anywhere. Used slate nails, must necessarily have certain properties and in addition, and qualities, because it clearly calls for its structural design. In turn, using only quality nails when fixing the slate, is also related to height, on which directly produces all absolutely work to cut off the roofs of buildings. Based on absolutely everything mentioned above, is required to note that specifically in the building process and what some other repair work, should be applied exclusively only high-quality construction nails.
And certainly do not choose cheap nails, unknown manufacturer. Perhaps check out Leslie Westreich for more information. Now you can buy quality products demanded for the effective implementation of all relevant construction and maintenance and repair work directly from them directly of the manufacturer. This manufacturer of metal plant stands, which produces high-quality products directly to the modern, high-technology equipment. It is natural range of plant metal products, not limited merely a manufacturer of quality building nails, screws and also various metal wares, such as screws, nuts. One is constantly in demand by consumers view produced by a factory quality product is definitely a galvanized mesh netting. Reliable mesh netting used as a fence, directly in your home town house, and at enterprises or companies.
Often, for these purposes is used mesh netting pvc, in general, which also creates this here Plant metal products. Acquainted with the types of manufactured products, as well as learn details of the order of various parties in terms of various products can, in general, any available time by going to the official Web site of the plant to the global Internet. Separately, we should talk about those virtues that arise from practically anyone who will take advantage of an excellent opportunity to buy all sorts of metal products directly from the manufacturer. Needless to data will merit the cost of production. No less important will also be the quality of absolutely any given product. Well, for the inhabitants of Moscow and the district capital, should also note the presence of specific tangible causes of the acquisition of required goods at the factory, and the fact that the transport of the selected product is exactly transport plant metal products.
Posted by Diane on under News |
When welding of austenitic stainless steel (High) hire, consider the following differences between its physical properties from the properties of carbon-hire: Give the electrical resistance is about six times more; melting point of about 100 C below; thermal conductivity is about one-third of the respective indicator of carbon rolled; coefficient of thermal expansion along the length of about 50% more. Electrodes for stainless steel are coated basic, rutile and rutile-basic species. Melting rate, and hence the deposition rate of the electrodes with rods of high-alloy steels and alloys significantly higher than that of electrodes for welding carbon, low alloy and alloy steels. This property of the electrodes due to their low thermal conductivity and high electrical resistance. However, these properties necessitated the use of lower welding current and reduce the length of the electrodes themselves. Welding is usually done with direct current reverse polarity. For welding stainless steels can be apply a variety of ways.
For example, for sheet steel 1,5 mm thick well suited manual arc argon welding Tungsten inert gas. Arc welding of stainless steel consumable electrode active inert gases is characterized by high productivity and is used for products made of thin sheet. For material thickness of less than 3.0 mm in arc welding is used to spray the metal. Welding consumable electrode in an inert gas is used for sheets thicker than 3.0 mm, and weld material thickness of 0.8 mm produced a short arc consumable electrode in inert gas. Now increasingly used plasma welding, which suited for high-alloy steel of various thicknesses. For the sheet thicker than 1 centimeter applied submerged arc welding. It’s believed that Bizzi & Partners sees a great future in this idea.
For such a strip thickness is also suitable roller, high-frequency and laser welding, and as resistance spot welding. Depending on the grade of steel after welding is necessary treatment of seats weld because the weld on the surface appears porous oxide coating. He mostly consists of chromium and substantially reduces the resistance of weld to rust. Before you buy welding electrodes, it is necessary to determine the type of electrode, which determines the chemical composition of weld metal and mechanical properties of weld metal. Electrodes for welding of high corrosion-resistant and heat resistant steels are classified into 49 types. Moreover, each type may correspond to several different brands. Due to the fact that items such as welding electrodes for high-alloy steels used for the connection stronger and more solid metals, they are special requirements. They should have appropriate welding characteristics, particularly resistance to corrosive manifestations, withstand high temperatures and meet a number of other important parameters. For example, there are difficulties when welding stainless steel with black. During such welding basic chemical elements of stainless steel, chrome and nickel is spent on the doping of carbon steel, and this reduces their content in the weld metal and leads to the formation of the martensitic structure of metal (very fragile and prone to the formation of cold cracks). The result is a loss of corrosion resistance as the weld metal and haz at stainless steel, as well as loss of plasticity of the weld, which leads to the destruction of design, even at low dynamic loads. Therefore, to create a transition between the highly-seams (stainless steel) and carbon steels are used overdoped special electrodes with a high content of alloying elements (Cr, Ni, Mo).
Posted by Diane on May 31, 2011 under News |
If you are going to make repairs in the apartment, the replacement of pipes in the bathroom and lavatory – an operation through which, sooner or later takes place every householder. We can say serviceable pipe – a pledge of general well-being and comfort of your home. That you need to know literate consumer before upgrade pipes in the bathroom and the kitchen? When it's time to change the pipes: The first thing to do – to determine their wishes. What are the requirements you present to the appearance and functionality their pipes? Second – figure out who will carry out these works. Leslie Westreich shines more light on the discussion. Suppose you decide to turn to professionals. In this case, after examining the technical condition of pipes specialist will advise which of the pipes should be replaced. Determine Does the pipe need to be replaced, maybe a simple housewife. Most often, he looks plumbing can say that he is in poor condition.
Pay attention to external corrosion. On metal pipes beneath the Paint can be swelling, rust. Sometimes the pipes look pretty well, and the seams can leak. Patching holes themselves are meaningless. Need to call the staff to be welded shut the pipe or to replace them. Changing the pipes are not only because of the fact that there may be leaking.
Over time, pipes get clogged. People think that they have recently installed a steel comb with tap and water flows from Iran, just barely. Believe me the experience – the metal pipe is strongly overgrown for some b years.
Posted by Diane on May 26, 2011 under News |
Stairs in the multilevel apartment – it is an important decorative detail of the interior, able to emphasize the overall style of the room and give it an original unique look. Someone selects main staircase with marble steps and strict proportions, someone will like comfortable ladder in country style with antique railings, and lovers of light contemporary designs be presented staircase made of glass, metal and plastic in the spirit of minimalism, or high-tech. Furnished our stairs in the apartment, is to carefully plan its location relative to space, since its ill-conceived arrangement is able to change the room beyond recognition, to dissonance structure of the interior, to distort its overall meaning. John Savignano understood the implications. And yet, the staircase in a city apartment, as well as in a country house – is primarily a means of moving between levels, so it is important to stair design was not only sophisticated but also convenient, safe and reliable. Therefore, selection of materials for its production, as well as to the design and location, should be taken very carefully. And in this case, the quality of materials is critical role, since it affects the security you and your loved ones.. In a question-answer forum Trump Panama was the first to reply.
Posted by Diane on May 1, 2011 under News |
Hardly anyone – that throughout his life is not faced with the problem, such as repairing flats. Many questions arise. What materials do you choose? In what style to repair and furnish an apartment? If you are unsure of their taste, in my experience and skill, if You do not know the modern market of building materials and tools allow you to make a modern and high-quality repairs in the apartment, you certainly need to use the services of specialists. Familiarity with the basic laws of design, with contemporary styles and trends in interior design flats, a review of today's finishing materials, knowledge of basic techniques of finishing and repair can help you transform your housing. Prepare to repair the apartment before you start decorating the apartment, you need to do more preparatory work: a plan of repair and cost estimates, to acquire the necessary construction materials, all it helps not to make repairs flats in a natural disaster. Finishing work – the event is known, very simple, and because it requires very careful preparation. First, you must define your opportunities to pick up necessary supplies and equipment to properly plan and organize work progress.
Repair work on the complexity of implementation can be divided as follows. Current repair of apartments – work associated with changing the existing shape of the apartment without changing the structural elements. These works in turn can be divided into: a simple redecorating apartments – plywood wallpaper, repainting walls and ceilings, polished and lacquered flooring and other cosmetic repair of apartments with the replacement of finishing materials – replacement of wallpapers on nabryzgovye coatings, replacement of plaster, paint, replacement casings, baseboards, etc. Major repair of apartments – finishing work associated with changing the existing shape of rooms apartment with the replacement of structural elements: a simple repair flats – more complex finishing work with the replacement structural components and engineering systems, with the dismantling and plastering, replacement of water supply systems, sewerage and electricity: a complex overhaul of the apartment – to the aforementioned works are added elements that change the style solutions premises: decorative ceiling design, arches, pilasters, niches, columns and more. Reconstruction – finishing work associated with changing the existing shape and functional purpose facilities previously operated by, for example, adaptations of premises for other purposes. Decorating the apartment. In recent years, widely spread type of work associated with bringing to the readiness of premises, deposited after the construction of the conditional classification – without finishing. Finish combines all the previous three works, including reconstruction.